SAP 065-598-009 - CR 65 -Dbl Line 12'x10' Box Culvert Br#65J02Riley Bros. Construction, Inc. R & G Construction Landwehr Construction Midwest Contracting, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$3,000.00$3,000.00$10,000.00$10,000.00$13,500.00$13,500.00$25,000.00$25,000.00
2104.503REMOVE PIPE CULVERTSL F301$10.00$3,010.00$10.00$3,010.00$9.30$2,799.30$6.00$1,806.00
2118.509AGGREGATE SURFACING CLASS 5TON275$21.00$5,775.00$18.00$4,950.00$23.20$6,380.00$16.00$4,400.00
2412.50212X10 PRECAST CONCRETE BOX CULV END SECTEACH4$23,500.00$94,000.00$25,000.00$100,000.00$24,985.00$99,940.00$30,000.00$120,000.00
2412.50312X10 PRECAST CONCRETE BOX CULVERTL F204$1,125.00$229,500.00$1,246.00$254,184.00$1,295.00$264,180.00$1,350.00$275,400.00
2442.501REMOVE EXISTING BRIDGELS1$3,000.00$3,000.00$5,000.00$5,000.00$7,250.00$7,250.00$4,000.00$4,000.00
2451.507GRANULAR BACKFILL (LV)C Y445$15.50$6,897.50$19.00$8,455.00$14.50$6,452.50$12.00$5,340.00
2451.507GRANULAR BACKFILL (LV)C Y905$15.50$14,027.50$19.00$17,195.00$14.50$13,122.50$12.00$10,860.00
2451.609PIPE BEDDING MATERIALTON520$27.80$14,456.00$25.00$13,000.00$27.00$14,040.00$35.00$18,200.00
2501.50215" CS SAFETY APRONEACH2$200.00$400.00$200.00$400.00$285.00$570.00$150.00$300.00
2501.50310" CS PIPE CULVERTL F50$20.00$1,000.00$30.00$1,500.00$28.00$1,400.00$25.00$1,250.00
2501.50315" CS PIPE CULVERTL F330$22.00$7,260.00$33.00$10,890.00$25.00$8,250.00$25.00$8,250.00
2501.50324" CS PIPE CULVERTL F40$60.00$2,400.00$50.00$2,000.00$57.00$2,280.00$35.00$1,400.00
2511.509RANDOM RIPRAP CLASS IIITON740$66.50$49,210.00$44.00$32,560.00$51.00$37,740.00$45.00$33,300.00
2520.507LEAN MIX BACKFILLC Y25$170.00$4,250.00$180.00$4,500.00$150.00$3,750.00$150.00$3,750.00
2563.601TRAFFIC CONTROLLS1$1,800.00$1,800.00$500.00$500.00$850.00$850.00$1,800.00$1,800.00
2573.502STORM DRAIN INLET PROTECTIONEACH4$150.00$600.00$150.00$600.00$165.00$660.00$150.00$600.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWL F800$1.35$1,080.00$1.35$1,080.00$1.50$1,200.00$1.35$1,080.00
2573.503FILTER BERM TYPE 5L F50$20.00$1,000.00$25.00$1,250.00$10.00$500.00$40.00$2,000.00
2575.504RAPID STABILIZATION METHOD 4S Y2,700$2.30$6,210.00$2.30$6,210.00$2.60$7,020.00$2.30$6,210.00
 Totals for project SAP 065-598-009 $448,876.00 $477,284.00 $491,884.30 $524,946.00
 
SAP 065-598-021 - CR 69 - Dbl Line 12'x10' Box Culvert Br#65J69Riley Bros. Construction, Inc. R & G Construction Landwehr Construction Midwest Contracting, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$4,000.00$4,000.00$10,000.00$10,000.00$2,400.00$2,400.00$15,000.00$15,000.00
2104.503REMOVE PIPE CULVERTSL F135$10.00$1,350.00$10.00$1,350.00$8.00$1,080.00$6.00$810.00
2118.509AGGREGATE SURFACING CLASS 5TON225$20.00$4,500.00$18.00$4,050.00$25.00$5,625.00$15.00$3,375.00
2412.50212X10 PRECAST CONCRETE BOX CULV END SECTEACH4$18,000.00$72,000.00$18,000.00$72,000.00$17,705.00$70,820.00$21,000.00$84,000.00
2412.50312X10 PRECAST CONCRETE BOX CULVERTL F96$1,338.00$128,448.00$1,230.00$118,080.00$1,305.00$125,280.00$1,300.00$124,800.00
2442.501REMOVE EXISTING BRIDGELS1$3,000.00$3,000.00$3,000.00$3,000.00$5,800.00$5,800.00$4,000.00$4,000.00
2451.507GRANULAR BACKFILL (LV)C Y460$15.50$7,130.00$19.00$8,740.00$16.00$7,360.00$14.00$6,440.00
2451.507GRANULAR BACKFILL (LV)C Y190$15.50$2,945.00$19.00$3,610.00$16.00$3,040.00$14.00$2,660.00
2451.609PIPE BEDDING MATERIALTON330$28.00$9,240.00$25.00$8,250.00$29.00$9,570.00$30.00$9,900.00
2501.50218" CS SAFETY APRONEACH1$220.00$220.00$300.00$300.00$320.00$320.00$200.00$200.00
2501.50224" CS SAFETY APRONEACH1$300.00$300.00$400.00$400.00$420.00$420.00$300.00$300.00
2501.50324" CS PIPE CULVERTL F60$45.00$2,700.00$45.00$2,700.00$35.00$2,100.00$33.00$1,980.00
2501.50318" CS PIPE CULVERTL F120$30.00$3,600.00$40.00$4,800.00$35.00$4,200.00$27.00$3,240.00
2511.509RANDOM RIPRAP CLASS IIITON310$65.50$20,305.00$44.00$13,640.00$52.00$16,120.00$40.00$12,400.00
2520.507LEAN MIX BACKFILLC Y15$200.00$3,000.00$180.00$2,700.00$160.00$2,400.00$150.00$2,250.00
2563.601TRAFFIC CONTROLLS1$1,800.00$1,800.00$500.00$500.00$850.00$850.00$1,800.00$1,800.00
2573.502STORM DRAIN INLET PROTECTIONEACH2$150.00$300.00$150.00$300.00$175.00$350.00$150.00$300.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWL F600$1.35$810.00$1.35$810.00$1.50$900.00$1.35$810.00
2573.503FILTER BERM TYPE 5L F50$20.00$1,000.00$25.00$1,250.00$10.00$500.00$40.00$2,000.00
2575.504RAPID STABILIZATION METHOD 4S Y1,200$2.50$3,000.00$2.50$3,000.00$2.80$3,360.00$2.50$3,000.00
 Totals for project SAP 065-598-021 $269,648.00 $259,480.00 $262,495.00 $279,265.00
 
SAP 065-598-022 - CR 63 - Dbl Line 16'x11' Box Culvert Br#65J68Riley Bros. Construction, Inc. R & G Construction Landwehr Construction Midwest Contracting, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$4,000.00$4,000.00$15,000.00$15,000.00$2,100.00$2,100.00$15,000.00$15,000.00
2104.503REMOVE PIPE CULVERTSL F54$10.00$540.00$10.00$540.00$8.00$432.00$6.00$324.00
2118.509AGGREGATE SURFACING CLASS 5TON220$21.00$4,620.00$18.00$3,960.00$23.00$5,060.00$17.00$3,740.00
2412.50216X11 PRECAST CONCRETE BOX CULV END SECEACH4$25,000.00$100,000.00$24,000.00$96,000.00$23,275.00$93,100.00$32,000.00$128,000.00
2412.50316X11 PRECAST CONCRETE BOX CULVERTL F96$1,575.00$151,200.00$1,600.00$153,600.00$1,750.00$168,000.00$1,800.00$172,800.00
2442.501REMOVE EXISTING BRIDGELS1$3,000.00$3,000.00$3,500.00$3,500.00$7,200.00$7,200.00$4,500.00$4,500.00
2451.507GRANULAR BACKFILL (LV)C Y145$15.50$2,247.50$19.00$2,755.00$13.50$1,957.50$15.00$2,175.00
2451.507GRANULAR BACKFILL (LV)C Y505$15.50$7,827.50$19.00$9,595.00$13.50$6,817.50$15.00$7,575.00
2451.609PIPE BEDDING MATERIALTON410$24.00$9,840.00$28.00$11,480.00$29.00$11,890.00$30.00$12,300.00
2501.50224" CS SAFETY APRONEACH2$300.00$600.00$400.00$800.00$420.00$840.00$300.00$600.00
2501.50324" CS PIPE CULVERTL F120$40.00$4,800.00$50.00$6,000.00$42.00$5,040.00$33.00$3,960.00
2511.509RANDOM RIPRAP CLASS IIITON400$63.50$25,400.00$45.00$18,000.00$52.00$20,800.00$45.00$18,000.00
2520.507LEAN MIX BACKFILLC Y15$200.00$3,000.00$180.00$2,700.00$160.00$2,400.00$150.00$2,250.00
2563.601TRAFFIC CONTROLLS1$1,800.00$1,800.00$500.00$500.00$850.00$850.00$1,800.00$1,800.00
2573.502STORM DRAIN INLET PROTECTIONEACH2$150.00$300.00$150.00$300.00$1.70$3.40$150.00$300.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWL F600$1.35$810.00$1.35$810.00$1.50$900.00$1.35$810.00
2573.503FILTER BERM TYPE 5L F50$20.00$1,000.00$25.00$1,250.00$10.00$500.00$40.00$2,000.00
2575.504RAPID STABILIZATION METHOD 4S Y1,400$2.50$3,500.00$2.50$3,500.00$2.80$3,920.00$2.50$3,500.00
 Totals for project SAP 065-598-022 $324,485.00 $330,290.00 $331,810.40 $379,634.00
 
SAP 065-598-020 - CR 52 - Sngl Line 16'x6' Box Culvert Br#65J70Riley Bros. Construction, Inc. R & G Construction Landwehr Construction Midwest Contracting, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$6,000.00$6,000.00$8,000.00$8,000.00$3,475.00$3,475.00$15,000.00$15,000.00
2101.501CLEARING & GRUBBINGLS1$1,500.00$1,500.00$1,500.00$1,500.00$7,600.00$7,600.00$1,500.00$1,500.00
2104.503REMOVE PIPE CULVERTSL F70$10.00$700.00$10.00$700.00$9.50$665.00$6.00$420.00
2118.509AGGREGATE SURFACING CLASS 5TON215$15.00$3,225.00$18.00$3,870.00$27.00$5,805.00$15.00$3,225.00
2412.50216X6 PRECAST CONCRETE BOX CULV END SECEACH2$15,000.00$30,000.00$13,000.00$26,000.00$12,805.00$25,610.00$15,000.00$30,000.00
2412.50316X6 PRECAST CONCRETE BOX CULVERTL F64$1,400.00$89,600.00$1,350.00$86,400.00$1,440.00$92,160.00$1,500.00$96,000.00
2442.501REMOVE EXISTING BRIDGELS1$3,000.00$3,000.00$5,000.00$5,000.00$5,500.00$5,500.00$4,000.00$4,000.00
2451.507GRANULAR BACKFILL (LV)C Y370$12.50$4,625.00$13.00$4,810.00$15.00$5,550.00$15.00$5,550.00
2451.507GRANULAR BACKFILL (LV)C Y280$12.50$3,500.00$13.00$3,640.00$15.00$4,200.00$15.00$4,200.00
2451.609PIPE BEDDING MATERIALTON240$19.00$4,560.00$26.00$6,240.00$28.00$6,720.00$35.00$8,400.00
2501.50224" CS SAFETY APRONEACH1$300.00$300.00$400.00$400.00$420.00$420.00$300.00$300.00
2501.50215" CS SAFETY APRONEACH1$200.00$200.00$180.00$180.00$285.00$285.00$150.00$150.00
2501.50324" CS PIPE CULVERTL F80$50.00$4,000.00$45.00$3,600.00$46.00$3,680.00$31.00$2,480.00
2501.50315" CS PIPE CULVERTL F60$25.00$1,500.00$31.00$1,860.00$30.00$1,800.00$25.00$1,500.00
2511.509RANDOM RIPRAP CLASS IIITON275$60.00$16,500.00$50.00$13,750.00$51.00$14,025.00$38.00$10,450.00
2563.601TRAFFIC CONTROLLS1$1,800.00$1,800.00$500.00$500.00$850.00$850.00$1,800.00$1,800.00
2573.503FILTER BERM TYPE 5L F50$20.00$1,000.00$25.00$1,250.00$10.00$500.00$40.00$2,000.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWL F450$1.35$607.50$1.35$607.50$1.50$675.00$1.35$607.50
2575.504RAPID STABILIZATION METHOD 4S Y1,200$2.50$3,000.00$2.50$3,000.00$2.80$3,360.00$2.50$3,000.00
2575.505RAPID STABILIZATION METHOD 1ACRE0.1$2,000.00$200.00$2,000.00$200.00$2,235.00$223.50$2,000.00$200.00
 Totals for project SAP 065-598-020 $175,817.50 $171,507.50 $183,103.50 $190,782.50
 
SAP 065-615-010 & 065-615-011 - CSAH 15 - Dbl Line 12'x8' Box Culvert Br#65J62, and Sngl Line 14'x5' Box Culvert Br#65J63Riley Bros. Construction, Inc. R & G Construction Landwehr Construction Midwest Contracting, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS0.5$5,000.00$2,500.00$35,000.00$17,500.00$15,950.00$7,975.00$92,000.00$46,000.00
2021.501MOBILIZATIONLS0.5$5,000.00$2,500.00$35,000.00$17,500.00$15,950.00$7,975.00$92,000.00$46,000.00
2101.501CLEARING & GRUBBINGLS0.5$2,000.00$1,000.00$2,000.00$1,000.00$6,950.00$3,475.00$2,500.00$1,250.00
2101.501CLEARING & GRUBBINGLS0.5$2,000.00$1,000.00$2,000.00$1,000.00$6,950.00$3,475.00$2,500.00$1,250.00
2104.503REMOVE PIPE CULVERTSL F28$10.00$280.00$10.00$280.00$8.00$224.00$8.00$224.00
2105.607EXCAVATION SPECIALC Y1,501$8.00$12,008.00$3.50$5,253.50$7.00$10,507.00$7.00$10,507.00
2105.607EXCAVATION SPECIALC Y2,474$8.00$19,792.00$3.50$8,659.00$7.00$17,318.00$7.00$17,318.00
2118.509AGGREGATE SURFACING CLASS 5TON620$21.00$13,020.00$17.75$11,005.00$19.00$11,780.00$17.00$10,540.00
2118.509AGGREGATE SURFACING CLASS 5TON623$21.00$13,083.00$17.75$11,058.25$19.00$11,837.00$17.00$10,591.00
2123.510DOZERHOUR8$200.00$1,600.00$180.00$1,440.00$170.00$1,360.00$200.00$1,600.00
2123.510DOZERHOUR8$200.00$1,600.00$180.00$1,440.00$170.00$1,360.00$200.00$1,600.00
2211.509AGGREGATE BASE CLASS 5TON1,457$21.00$30,597.00$17.75$25,861.75$19.50$28,411.50$17.00$24,769.00
2211.509AGGREGATE BASE CLASS 5TON1,424$21.00$29,904.00$17.75$25,276.00$19.50$27,768.00$17.00$24,208.00
2412.50212X12 PRECAST CONCRETE BOX CULV END SECTEACH4$20,000.00$80,000.00$20,000.00$80,000.00$20,175.00$80,700.00$45,000.00$180,000.00
2412.50214X7 PRECAST CONCRETE BOX CULV END SECTEACH1$14,000.00$14,000.00$19,000.00$19,000.00$14,885.00$14,885.00$16,000.00$16,000.00
2412.50214X7 PRECAST CONCRETE BOX CULV END SECTEACH1$21,000.00$21,000.00$19,000.00$19,000.00$19,270.00$19,270.00$27,000.00$27,000.00
2412.50314X7 PRECAST CONCRETE BOX CULVERTL F58$1,100.00$63,800.00$1,230.00$71,340.00$1,055.00$61,190.00$1,450.00$84,100.00
2412.50312X12 PRECAST CONCRETE BOX CULVERTL F144$1,280.00$184,320.00$1,420.00$204,480.00$1,215.00$174,960.00$2,500.00$360,000.00
2442.501REMOVE EXISTING BRIDGELS1$3,000.00$3,000.00$5,000.00$5,000.00$7,350.00$7,350.00$12,000.00$12,000.00
2442.501REMOVE EXISTING BRIDGELS1$3,000.00$3,000.00$5,000.00$5,000.00$7,350.00$7,350.00$12,000.00$12,000.00
2451.507STRUCTURE EXCAVATION CLASS EC Y1,353$4.00$5,412.00$2.00$2,706.00$7.00$9,471.00$10.00$13,530.00
2451.507GRANULAR BACKFILL (CV)C Y1,110$20.00$22,200.00$21.00$23,310.00$20.00$22,200.00$18.00$19,980.00
2451.507STRUCTURE EXCAVATION CLASS RC Y139$100.00$13,900.00$55.00$7,645.00$175.00$24,325.00$600.00$83,400.00
2451.507STRUCTURE EXCAVATION CLASS EC Y2,708$4.00$10,832.00$2.00$5,416.00$7.00$18,956.00$10.00$27,080.00
2451.507GRANULAR BACKFILL (CV)C Y2,873$20.00$57,460.00$21.00$60,333.00$20.00$57,460.00$18.00$51,714.00
2451.507GRANULAR BACKFILL (CV)C Y1,061$20.00$21,220.00$21.00$22,281.00$20.00$21,220.00$18.00$19,098.00
2451.609PIPE BEDDING MATERIALTON202$31.00$6,262.00$28.00$5,656.00$27.00$5,454.00$40.00$8,080.00
2451.609PIPE BEDDING MATERIALTON185$31.00$5,735.00$28.00$5,180.00$27.00$4,995.00$40.00$7,400.00
2501.50224" CS SAFETY APRON EACH2$350.00$700.00$400.00$800.00$420.00$840.00$350.00$700.00
2501.50324" CS PIPE CULVERTL F58$60.00$3,480.00$52.00$3,016.00$49.00$2,842.00$30.00$1,740.00
2511.509RANDOM RIPRAP CLASS IIITON177$59.00$10,443.00$50.00$8,850.00$52.00$9,204.00$45.00$7,965.00
2511.509RANDOM RIPRAP CLASS IIITON13$59.00$767.00$50.00$650.00$52.00$676.00$45.00$585.00
2511.509RANDOM RIPRAP CLASS IIITON120$59.00$7,080.00$50.00$6,000.00$52.00$6,240.00$45.00$5,400.00
2520.507LEAN MIX BACKFILLC Y30$200.00$6,000.00$180.00$5,400.00$160.00$4,800.00$150.00$4,500.00
2563.601TRAFFIC CONTROLLS0.5$7,000.00$3,500.00$8,000.00$4,000.00$8,950.00$4,475.00$1,000.00$500.00
2563.601TRAFFIC CONTROLLS0.5$7,000.00$3,500.00$8,000.00$4,000.00$8,950.00$4,475.00$1,000.00$500.00
2573.501EROSION CONTROL SUPERVISORLS0.5$500.00$250.00$1,500.00$750.00$1,800.00$900.00$7,000.00$3,500.00
2573.501EROSION CONTROL SUPERVISORLS0.5$500.00$250.00$1,500.00$750.00$1,800.00$900.00$7,000.00$3,500.00
2573.503SILT FENCE; TYPE MSL F848$1.50$1,272.00$1.50$1,272.00$1.70$1,441.60$1.50$1,272.00
2573.503SEDIMENT CONTROL LOG TYPE WOOD CHIPL F255$1.50$382.50$1.50$382.50$1.70$433.50$1.50$382.50
2573.503SILT FENCE; TYPE MSL F834$1.50$1,251.00$1.50$1,251.00$1.70$1,417.80$1.50$1,251.00
2573.503SEDIMENT CONTROL LOG TYPE WOOD CHIPL F400$1.50$600.00$1.50$600.00$1.70$680.00$1.50$600.00
2573.503FLOTATION SILT CURTAIN TYPE MOVING WATERL F47$15.00$705.00$15.00$705.00$16.50$775.50$15.00$705.00
2575.501TURF ESTABLISHMENTLS0.5$1,500.00$750.00$1,500.00$750.00$1,675.00$837.50$1,500.00$750.00
2575.501TURF ESTABLISHMENTLS0.5$1,500.00$750.00$1,500.00$750.00$1,675.00$837.50$1,500.00$750.00
2575.504EROSION CONTROL BLANKETS CATEGORY 3NS Y2,832$1.75$4,956.00$1.75$4,956.00$2.00$5,664.00$1.75$4,956.00
2575.504EROSION CONTROL BLANKETS CATEGORY 3NS Y5,208$1.75$9,114.00$1.75$9,114.00$2.00$10,416.00$1.75$9,114.00
 Totals for project SAP 065-615-010 & 065-615-011 $696,775.50 $717,617.00 $721,106.90 $1,165,909.50
 
SAP 065-599-079 - Hector Township - Bridge 65J82Riley Bros. Construction, Inc. R & G Construction Landwehr Construction Midwest Contracting, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$3,000.00$3,000.00$5,000.00$5,000.00$2,100.00$2,100.00$15,000.00$15,000.00
2104.503REMOVE PIPE CULVERTSL F91$10.00$910.00$10.00$910.00$7.00$637.00$6.00$546.00
2118.509AGGREGATE SURFACING CLASS 5TON200$21.00$4,200.00$18.00$3,600.00$24.00$4,800.00$20.00$4,000.00
2412.50210X5 PRECAST CONCRETE BOX CULV END SECTEACH2$10,000.00$20,000.00$10,000.00$20,000.00$10,025.00$20,050.00$10,000.00$20,000.00
2412.50310X5 PRECAST CONCRETE BOX CULVERTL F75$1,000.00$75,000.00$980.00$73,500.00$1,025.00$76,875.00$1,100.00$82,500.00
2442.501REMOVE EXISTING BRIDGELS1$1,500.00$1,500.00$4,000.00$4,000.00$3,700.00$3,700.00$4,000.00$4,000.00
2451.507GRANULAR BACKFILL (LV)C Y230$15.50$3,565.00$19.00$4,370.00$14.00$3,220.00$18.00$4,140.00
2451.609PIPE BEDDING MATERIALTON190$27.80$5,282.00$27.00$5,130.00$31.00$5,890.00$35.00$6,650.00
2501.50215" CS PIPE APRONEACH2$200.00$400.00$200.00$400.00$285.00$570.00$150.00$300.00
2501.50315" CS PIPE CULVERTL F230$30.00$6,900.00$33.00$7,590.00$30.00$6,900.00$20.00$4,600.00
2511.509RANDOM RIPRAP CLASS IIITON300$61.00$18,300.00$47.00$14,100.00$53.00$15,900.00$48.00$14,400.00
2563.601TRAFFIC CONTROLLS1$1,800.00$1,800.00$500.00$500.00$850.00$850.00$1,800.00$1,800.00
2573.502STORM DRAIN INLET PROTECTIONEACH2$150.00$300.00$150.00$300.00$170.00$340.00$150.00$300.00
2573.503FILTER BERM TYPE 5L F50$20.00$1,000.00$25.00$1,250.00$10.00$500.00$40.00$2,000.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWL F200$1.35$270.00$1.35$270.00$1.50$300.00$1.35$270.00
2575.504RAPID STABILIZATION METHOD 4S Y700$3.00$2,100.00$3.00$2,100.00$3.35$2,345.00$3.00$2,100.00
 Totals for project SAP 065-599-079 $144,527.00 $143,020.00 $144,977.00 $162,606.00
 
SAP 065-599-080 - Melville Township - Bridge 65J83Riley Bros. Construction, Inc. R & G Construction Landwehr Construction Midwest Contracting, LLC 
Item No.ItemUnitsQuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price
2021.501MOBILIZATIONLS1$4,000.00$4,000.00$10,000.00$10,000.00$2,100.00$2,100.00$15,000.00$15,000.00
2118.509AGGREGATE SURFACING CLASS 5TON250$21.00$5,250.00$18.00$4,500.00$26.50$6,625.00$20.00$5,000.00
2412.50212X8 PRECAST CONCRETE BOX CULV END SECTEACH2$17,000.00$34,000.00$14,000.00$28,000.00$16,480.00$32,960.00$17,000.00$34,000.00
2412.50312X8 PRECAST CONCRETE BOX CULVERTL F81$1,200.00$97,200.00$1,273.00$103,113.00$1,250.00$101,250.00$1,400.00$113,400.00
2442.501REMOVE EXISTING BRIDGELS1$1,500.00$1,500.00$3,500.00$3,500.00$6,150.00$6,150.00$5,000.00$5,000.00
2451.507GRANULAR BACKFILL (LV)C Y225$16.00$3,600.00$19.00$4,275.00$16.00$3,600.00$18.00$4,050.00
2451.609PIPE BEDDING MATERIALTON250$27.80$6,950.00$28.00$7,000.00$30.00$7,500.00$35.00$8,750.00
2501.50215" CS PIPE APRONEACH1$200.00$200.00$200.00$200.00$285.00$285.00$150.00$150.00
2501.50315" CS PIPE CULVERTL F80$30.00$2,400.00$37.00$2,960.00$38.00$3,040.00$20.00$1,600.00
2511.509RANDOM RIPRAP CLASS IIITON450$66.00$29,700.00$47.00$21,150.00$57.00$25,650.00$46.00$20,700.00
2563.601TRAFFIC CONTROLLS1$1,800.00$1,800.00$500.00$500.00$850.00$850.00$1,800.00$1,800.00
2573.502STORM DRAIN INLET PROTECTIONEACH1$150.00$150.00$150.00$150.00$170.00$170.00$150.00$150.00
2573.503FILTER BERM TYPE 5L F50$20.00$1,000.00$25.00$1,250.00$10.00$500.00$40.00$2,000.00
2573.503SEDIMENT CONTROL LOG TYPE STRAWL F300$1.35$405.00$1.35$405.00$1.50$450.00$1.35$405.00
2575.504RAPID STABILIZATION METHOD 4S Y2,600$2.30$5,980.00$2.30$5,980.00$2.60$6,760.00$2.30$5,980.00
 Totals for project SAP 065-599-080 $194,135.00 $192,983.00 $197,890.00 $217,985.00
 
Contract Total:$2,254,264.00$2,292,181.50$2,333,267.10$2,921,128.00